Paradise Valley Community College Building Fitness Renovation

location

Phoenix, AZ

Client

Maricopa Community Colleges​

sqft

25,000

Project DEscription

Over summer break, GCON managed the complete overhaul of the 25,000 SQ FT facilities’ HVAC systems. Work included the replacement of the roof top chilled water air handler system, including modernization of the outside air and ventilation systems. Additionally, a new fire sprinkler system was added to the facility. The entire ceiling in the facility was removed and replaced to accommodate access for the above-ceiling construction. Roofing was completed in all areas of modified structural and HVAC. The work was required to be expedited for completion over the three-month summer break.