Paradise Valley Community College Building Fitness Renovation
location
Phoenix, AZ
Client
Maricopa Community Colleges
sqft
25,000
Project DEscription
Over summer break, GCON managed the complete overhaul of the 25,000 SQ FT facilities’ HVAC systems. Work included the replacement of the roof top chilled water air handler system, including modernization of the outside air and ventilation systems. Additionally, a new fire sprinkler system was added to the facility. The entire ceiling in the facility was removed and replaced to accommodate access for the above-ceiling construction. Roofing was completed in all areas of modified structural and HVAC. The work was required to be expedited for completion over the three-month summer break.